Expected Loss (Y) vs. Avg. Year Built (X2)
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.835497514
R Square 0.698056096
Adjusted R Square 0.672894104
Standard Error 11700933.8
Observations 14
ANOVA
  df SS MS F Significance F
Regression 1 3.79827E+15 3.79827E+15 27.74248147 0.000198746
Residual 12 1.64294E+15 1.36912E+14
Total 13 5.44122E+15      
  Coefficients Standard Error t Stat P-value Lower 95% Upper 95%
Intercept -4632225.824 7376886.003 -0.627937835 0.541810607 -20705079.42 11440627.77
Avg. Year Built 1412510.634 268175.4844 5.267113201 0.000198746 828206.4581 1996814.81
RESIDUAL OUTPUT
Observation Predicted Expected Loss Residuals
1 11510752.85 -10533038.18
2 6040076.746 -297331.6619
3 17385904.77 -1734536.323
4 16439654.13 -1865139.297
5 15714653.55 -2905848.374
6 31718605.59 -3873831.375
7 21374793.79 19712970.05
8 46170131.65 2234945.053
9 28683908.46 -9647779.292
10 29741763.73 2251485.624
11 47910529.56 -15560436.24
12 39502114.11 21146071.87
13 53302896.21 13192604.25
14 62325254.5 -12120136.12